CONTRACTS
LOAD & HAUL SERVICES – TONGAAT QUARRY, DURBAN
Client: Lafarge Mining South Africa (Pty) Ltd
Date: Jun 2019 – ongoing (3 year contract)
Volumes: 45 000 tons per month
Value: R21 627 000
Scope of works: Load and haul blast material to the primary crusher and honey hole stockpile.
LOAD & HAUL SERVICES – RIDGEVIEW QUARRY, DURBAN
Client: Lafarge Mining South Africa (Pty) Ltd
Date: May 2018 – ongoing (Initial 12 Month contract which has been extended to a 3 year contract)
Volumes: 90 000 tons per month
Value: R50 762 400
Scope of works: Load and haul blast material to the primary crusher and honey hole stockpile.
REHABILITATION OF AIRSTRIP – GREYTOWN, KWA-ZULU NATAL
Client: Plennegy (PTY) LTD
Date: Feb 2020 – May 2020
Volumes: 90 000 tons per month
Value: R1 700 000
Scope of works: Earth drainage, runway crack sealing and premixing on runway section.
CONSTRUCTION OF BULK EARTHWORKS PLATFORM FOR MIDWAY MALL - MIDWAY CROSSING, KWAZULU NATAL
Client: Siveni Investments (PTY) Ltd
Date: 19 July 2019 – March 2020
Volumes: 93 000m3
Value: R13 313 950
Scope of works: Construction of Bulk Earthworks platform for Midway Mall
CONSTRUCTION OF NEW PEDESTRIAN BRIDGE – ERASMUSRAND, PRETORIA
Client: SANRAL
Date: Aug 2018 – Jun 2019 (10 Months)
Value: R21 573 027
Scope of works: Construction of pedestrian bridge.
CONSTRUCTION OF MINOR ACCESS ROADS AND SIDE WALKS – KWAMASHU, DURBAN
Client: Ethekwini Municipality
Date:Aug 2017 – Jan 2018 (4 months)
Value: R786 178
Scope of works: Bulk excavations, layerworks, kerbing, channelling, premix surfacing, sidewalks, and gabion installations.
MODULAR PLANT EXPANSION & PROJECT HANDLING FACILITY - SISHEN MINE, NORTHERN CAPE
Client: Stefanutti Stocks Mechanical
Date: Jun 2017 – Jun 2018 (12 month duration)
Value: R30 739 953
Scope of works: Bulk earthworks, including the removal of old foundations and soil improvements, excavations and various reinforced concrete structures.
MAFUBE COAL MINE LIFE EXTENSION PROJECT – MIDDELBURG, MPUMULANGA
Client: SMEI Projects Newco (Pty) Ltd
Date: Jan 2017 – Jul 2018 (18 months)
Value: R44 081 506
Scope of works: Bulk earthworks and civil construction of a 7.2 km coal conveyor.
FABRICATION AND ERECTION OF 12 METER HIGH FREESTANDING SQUARE LATTICE TOWER – PORT ELIZABETH, EASTERN CAPE
Client: Sentech
Date: Aug 2018 – Nov 2018 (4 Months)
Value: R739 907
Scope of works: Supply, fabricate and erection of tower.
NOKENG TAILINGS STORAGE FACILITY – RUST DE WINTER, LIMPOPO
Client: Sepfluor Mine
Date: May 2018 – Aug 2018 (4 Months)
Value: R13 849 379
Scope of works: Construction of Phase 1 of the tailings storage facility for Nokeng Fluorspar mine.
REPAIR OF INTERNAL CRACKS ON BULK ASH SILO – WITBANK, MATLA POWER STATION, MPUMALANGA
Client: Eskom
Date: Mar 2017 – Sep 2018 (7 months)
Value: R2 004 242
Scope of works: Repair of Bulk Ash Silo 2, internal cracks.
CONSTRUCTION OF BALANCING TANK, LOW LEVEL SCHEME PHASE 3 – NOOITGEDAAGT COEGA, PORT ELIZABETH
Client: Stefanutti Stocks Coastal
Date: Nov 2017 – Feb 2018 (4 months)
Value: R1 336 903
Scope of works: Layerworks and concrete works that formed the water retaining structure.